Pattern #4 Drifting Diamonds Dress, page 14
Updated: 01Sep2022
Correction is underlined.
On chart, rnds 1—8 should be repeated 4 (6, 7) times.
Pattern #7 Pinstripe Blocks Blanket, page 21
Updated: 08Jan2016
A placement diagram has been published. [PDF 193K]
Pattern #13 All About Aran Set, pages 40-45
Updated: 01Sep2022
Replace the instructions for 3-st RPC and 3-st LPC in the Stitch Glossary with the following:
3-st RPC Sl 1 st to cn and hold to back, k2, p1 from cn.
3-st LPC Sl 2 sts to cn and hold to front, p1, k2 from cn.
For next section, correction is underlined.
Right Front
BEG CHART PATS
. . . Keeping 1 st at beg of row and 3 (6) sts at end of row in St st, work chart 3 through row 18 . . .
Pattern #23 Twisted Diamond Afghan, page 72
Updated: 05May2015
A revised chart has been published. [PDF 238K]
Pattern #24 Mini Mackintosh page 74, 3rd column
Updated: 26Jun2016
Correction is underlined.
YOKE
Next (inc) rows (RS) [K to 1 st before marker, kfb, sl marker, kfb]
4 times, k to end—8 sts inc’d.
Pattern #26 Mouse-Mobile, page 80 and 82
Updated: 27Nov2018
Page 80, in the third column, under HEAD, after Rnd 2, replace instructions as follows:
Rnd 3 [K1, M1, k1] 6 times–18 sts.
Rnd 4 Knit.
Rnd 5 [K2, M1, k1] 6 times–24 sts.
Rnd 6 Knit.
Rnd 7 [K3, M1, k1] 6 times–30 sts.
Rnds 8–12 Knit.
Rnd 13 [K3, k2tog] 6 times–24 sts.
Rnds 14–16 Knit.
Rnd 17 [K2, k2tog] 6 times–18 sts.
Rnds 18–20 Knit.
Rnd 21 [K1, k2tog] 6 times–12 sts.
Rnds 22–24 Knit.
Stuff Head.
Rnd 25 [K2tog] 6 times–6 sts.
Fasten off and weave yarn tail through remaining 6 sts.
Draw yarn through the front of the muzzle to make two cheeks.
Page 82
First column, under EARS (make 2). Correction is underlined.
EARS (make 2)
Short rows (RS) K6, w&t, p4, w&t…
Page 82
Third column, under Car, RIGHT SIDE, BEG MEDALLION. Correction is underlined.
Row 9 (dec) K19, E, k2 D,…
Page 83
First column, under CENTER OF CAR. Correction is underlined.
With C, cont in St st and inc 1 st each side every even row 3 times–12 sts.
Work 41 rows even, end with a WS row. Break C
Pattern #31 Eyelet Mock Turtleneck, page 98
Updated: 08Jun2019
Corrections are underlined.
Materials
• 2 (2, 3) 1¾oz/50g skeins (each approx 180yd/165m) of Cascade Yarns Cherub DK Multis (nylon/acrylic) in #504 ballerina
Pattern #37 Giraffe Stroller Blanket, page 118
Updated: 08Jun2019
Corrections are underlined.
Materials
• Two 1¾oz/50g skeins (each approx 180yd/165m) of Cascade Yarns Cherub DK (nylon/acrylic) in #9 ecru (A)
Gauge
22 sts and 29 rows to 4″/10cm over St st using size 6 (4mm) needles. Take time to check gauge.
Pattern #47 Striped Raglan Cardigan, page 150
Updated: 15Jan2020
Corrections are underlined.
Finishing
NECKBAND
Row 2 (RS) P1, *k2, p2; rep from *, end k2, p1.
Pattern #50 Lace Cardi & Bonnet, page 157
Updated: 30Apr2015
The following sizes and measurements were omitted:
Sizes
Cardigan sized for 6 months (and 12 months). Shown in 6 months. Bonnet is one size.
Knitted Measurements
Chest (closed) 20 (22¼)”/51 (56.5)cm
Length 10 (11½)”/25.5 (29)cm
Pattern #51 Colorblock Cabled Pullover, page 162
Updated: 29Jul2019
Corrections are underlined.
Sleeves
BEGIN CHART PAT
Keeping 2 sts each side as k on RS as established, inc 1 st each side (working new sts in k2, p2 rib) every 6th row 6 (2, 7) times more, then every 4th row 0 (7, 1) times.
Pattern #53 Slanting Stripes Blanket, page 166
Updated: 02Jun2023
Corrections are underlined.
Omit “Note Cast-on row is first row of stripe pat.”
Stripe Pat 1
76 rows B, [6 rows A, 6 rows, C, 6 rows A, 24 rows B] twice, 6 rows A, 6 rows, C, 6 rows A, cont with B to end.
Stripe Pat 2
54 rows A, 24 rows C, 56 rows A, 10 rows B, 10 rows A, 30 rows C, cont with A to end.
Stripe Pat 3
30 rows A, [4 rows C, 4 rows A] 4 times, 20 rows B, 70 rows A, 4 rows C, 4 rows A, 4 rows C, cont with A to end.
Stripe Pat 4
30 rows B, [6 rows C, 4 rows B] twice, 6 rows C, 30 rows B, 30 rows A, 30 rows B, [4 rows C, 4 rows B] 3 times, 4 rows C, cont with B to end.
Pattern #55 Garter Stitch Hoodie, page 174
Updated: 31Mar2015
The colors were reversed.
They should be as follows:
2 skeins #22 rouge (MC)
1 skein #19 geranium (CC)
Pattern #57 Railroad Cap, pages 180-182
Updated: 01Sep2022
Correction is underlined.
Rnd 1 Work to rep line, work 10-st rep 5 times around.
Cont to work chart in this way until rnd 9 is complete.
Break B and C and cont with A only to end of hat.
A revised Chart is available here. [PDF 367KB]