Clockwork Pullover, page 25
Updated: 29Jul2019
Chart 1
On round 38, the 2-st twisted LC worked over the 16th and 17th stitches (first cable after the blank section in the center of the chart) should be a 2-st twisted RC.
Dragonfly Pullover, page 72
On portion of chart on page 72 only, the first cables encountered on rnds 105, 107, 109, 111, and 115 should each be a 2/2 LC.
A corrected chart can be downloaded here. [PDF 51KB]
Traveling Cables Turtleneck, page 76
An updated Front & Back schematic is available for download here. [PDF 187 KB]
Cabled-Collar Pullover, page 86
An updated Front & Back schematic is available for download here. [PDF 200KB]
Chain Link Cable Pullover, page 90
Updated: 02Jun2023
A revised chart can be downloaded here. [PDF 147KB]
Counterpane Pullover, pages 100-102
Updated versions of Chart 1-First Half and Chart 1-Second Half are available for download here. [PDf 331KB]
Updates to Chart 2—Second Half are as follows:
Row 77 (RS) — row should end with 3 knit sts
Row 78 (WS) — row should start with 3 purl sts
Cable and Chevron Top, page 147
In the Stitch Glossary, the second 4-st RC should be 4-st LC. See correct stitch definitions below (correction underlined).
4-st RC Sl 2 sts to cn and hold to back, k2, k2 from cn.
4-st LC Sl 2 sts to cn and hold to front, k2, k2 from cn.
Persian Yoke Pullover, page 172
Correction is underlined.
Dec rnd K2, k2tog, k to 4 sts before next marker, ssk, k2, sm, k2, k2tog, k to 4 sts before marker, ssk, k2—4 sts dec’d.