ISBN-10: 1-931543-79-8

Cabled Poncho, pages 56-59

The following changes should be made to the chart on page 59:

1. The dec on row 7 should be noted in row 8 and row 9 by blocking out st 28 – 26 sts each rep. Note in row 8 that st 27 should be marked as a Rev st st.

2. The dec on row 9 should be worked over st 29 and st 1 of next rep, and noted in row 10 by blocking out st 29 – 25 st each rep. 

3. Chart correction
Row 23 Sts 4 and 27 should be worked as purl sts.

4. Row 25 – the 6-st FC over sts 7 – 12 should be a 6-st BC.

The following changes should be made to the Stitch Glossary on page 57:

1. “4-st FPC dec” should be changed to “5-st BPC pdec”, the text remains the same.

2. Delete “8-st BC” entirely, that cable is not used in this pattern.

The following change should be made to the stitch key on page 58:

1. “5-st FPC kdec” at the bottom of the list should be changed to “5-st FPC pdec”. “5-st FPC Kdec”, 9th from the top of the list, remains the same.

Cabled Poncho, page 57

There is a correction to Row 8 of the chart on page 59. 

Click here to download the corrected chart in PDF format. [PDF 203KB]

Ribbon Caplet, page 61

CAPELET 

Next (inc) rnd *K to 1 st before marker…

Next rnd Knit. Rep last 2 rnds…

Lace-Cable Poncho, page 63

Correction is underlined.

PONCHO PANEL

Rows 3, 5 and 7 K2, *p3, k1, p1 tbl, k1; rep from * to last 6 sts, p3, k1, p1tbl, k1.

Chunky Poncho, pages 66, 67

Updated: 03Dec2014 

PONCHO
Shaping
Note
Use 2nd color….

Work pattern to this point, then replace the rest of the pattern with the following –

Next (setup and inc) rnd K8 for back, [p2, k2, p2] for shoulder, k6, M1, pm, [p2, k2, M1, k2, M1, k2, p2] for front cable panel, pm, M1, k6, [p2, k2, p2] for shoulder, [k8, pm, M1, k2, M1] for back – 58 sts.
Next rnd K8, p2, k2, p2, k7, slip marker (sm), p2, k8, p2, sm, k7, p2, k2, p2, k8, sm, k4.
Next (inc) rnd K8, p2, k2, p2, k7, M1, sm, p2, k8, p2, sm, M1, k7, p2, k2, p2, k8, sm, M1, k4, M1 – 62 sts.
Next rnd K8, p2, k2, p2, k8, sm, p2, k8, p2, sm, k8, p2, k2, p2, k8, sm, k6 – 62 sts.

Cont as established with inc’d sts worked in St st as foll:

Inc rnd Work to marker, M1, sm, work to marker, sm, M1, work to marker, sm, M1, work to end, M1 – 66 sts.
Next rnd Work even, slipping all markers.
Cable rnd Work to marker, M1, sm, p2, 8-st FC, p2, sm, M1, work to marker, sm, M1, work to end, M1 – 70 sts.
Cont to increase 4 sts every other rnd, as established, until there are 178 sts, AT SAME TIME work the cable rnd every 10th rnd. Bind off using 2-rnd bind-off method.

Textured Poncho, page 80

MATERIALS 

The following was listed in error; it is not used in this pattern:
1 skein 4oz/113g of Lamb’s Pride Bulky wool/mohair